Historic Downtown Revite set to begin in April
- This topic has 0 replies, 1 voice, and was last updated 21 years, 9 months ago by
savage.
Viewing 0 reply threads
-
AuthorPosts
-
-
March 23, 2004 at 12:34 am #5311
savageModeratorAfter years of debate and politics the Historic Downtown will finally be getting a face lift. This April construction begins on widening the sidewalks and installing Victorian style street fixtures. 6th street, between 2nd and 1st Avenue, is being converted to a pedestrian plaza named Centenial plaze to coencide with Fernie’s 100 birthday. Overall the Downtown will be a more enjoyable space for everybody.

-
-
AuthorPosts
Viewing 0 reply threads
Login & Signup
| Overnight | 24h | 48h | 7 days |
|---|---|---|---|
| 37 cm | 37 cm | 39 cm | 51 cm |
| 14.6 in | 14.6 in | 15.4 in | 20.1 in |
| Base | This Season |
|---|---|
| 123 cm | 321 cm |
| 48.4 in | 126.4 in |
Featured Event
Fernie Ghostriders Hockey Home Game
Location: Fernie Memorial Arena
Date: 19/12/2025
Time: 18:30 - 21:30








